I feel very unaccomplished for January. The only completions I had were the orphan blocks and the green blocks for RSC.
I always keep my next 6 projects in these boxes. I actually have 12 but that got too complicated.
A couple of weeks ago I spent 2 afternoons cutting parts for tops. I had cut the parts for all of the projects in boxes 1-4 plus the Just 2 Charm Pack for the QAL with Cheryl. Because I'm going on retreat from Feb. 8th - 11th and the blocks for this challenge are to be completed by the 13th, this is one of the projects I'm taking with me. I asked DH to pick one from the book and this is the one he chose.
There are 8 of the blocks on the top, 4 each of the hourglass blocks and 5 of the smaller ones which aren't finished yet. I chose this kit because of the colors. I didn't pay attention to the content being about knitting. I know how to knit but I don't.
Then this week I rolled a 6, another one that wasn't cut 😬. It has now been cut and I will begin stitching this weekend.
February Goals
1. I obligated myself for 2 project bags per month. Everyone at our fall retreat will receive one upon arrival. The January ones didn't get done, so I have a goal of making 4 of them this month.
2. Red RSC blocks
3. Just 2 Charm Pack units into a flimsy.
4. Bind Buttercup and Slate, wash and crinkle and photo.
I'm keeping this list kind of short because my sister and BIL will be visiting for a week two days after I return from retreat. I probably need to a little straightening before they come.
Wishing you more stitchin time than I will have.
Rose
1 comment:
Your wall of completions looks a lot like mine, and I still don't have my post ready - lol! Enjoy your retreat!
Post a Comment